Farm Drainage and Flood Control

Fields that shed heavy rain instead of drowning: flood lines mapped, drains, culverts and raised beds that work, contour planting on slopes, routines after every storm, and animals and stored crops kept above the water.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Farm Drainage and Flood Control, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information, not a safety manual or a substitute for proper training. Follow the law where you live and work, the manufacturer's and label instructions for machinery, chemicals, animal medicines and equipment, and any site safety rules. Use trained, licensed or certified people for regulated work such as electrical, gas, structural, pesticide or veterinary work, and stop if something seems unsafe.

What it installs.

1

Pillar

1

Area

50

Projects

202

Starter tasks

🌾 Agriculture & Agribusiness

Farm Drainage and Flood Control

Dealing with heavy rain and flooding: drainage channels, raised beds, contour planting, culverts, and protecting animals and stored crops.

  1. Wet season flood mark map of the farm
  2. Catchment and outfall survey
  3. Auger hole and percolation test by field
  4. Ten-year flood history from neighbours and records
  5. Watercourse rules and neighbour outfall agreement
  6. Farm levels survey with pegs and a line level
  7. One-page farm drainage plan
  8. Drainage tool kit and rain gauge set-up
  9. High ground for animals, feed and stored crops
  10. Rainfall and flood warning alerts
  11. Daily rain gauge and waterlogging log
  12. Drain walk and desilting routine
  13. Culvert and grate inspection
  14. Pre-wet-season drainage overhaul
  15. Post-storm field inspection checklist
  16. Raised bed and furrow maintenance
  17. Flood pump and sump maintenance
  18. Grassed waterway and drain bank mowing
  19. Silt trap emptying
  20. Monthly drainage review
  21. Reading waterlogging signs in soil and crops
  22. Sizing drains and culverts with the extension officer
  23. Laying out contour lines with an A-frame
  24. Building raised and cambered beds
  25. Crop tolerance to waterlogging
  26. Safe work in floodwater and drains
  27. Open ditch or pipe drain decision
  28. Fixing the worst waterlogged field
  29. Upsizing the farm entrance culvert
  30. Choosing a drainage contractor or excavator hire
  31. Cut-off drain above the fields
  32. Moving pens or stores off the flood line
  33. Roof water and yard runoff control
  34. Choosing a portable flood pump
  35. Contour hedgerows to slow runoff on slopes
  36. Commissioning new drains in the first big rain
  37. Flood day action plan
  38. After-flood field recovery and replanting
  39. Shared drain clearing day with neighbours
  40. Yearly drainage walk with the extension officer
  41. Draining heavy clay on flat coastal land
  42. Water management on a hillside plot
  43. Living with river flooding on riverside land
  44. Mud and drainage in livestock yards and pens
  45. Drainage works on rented or leased land
  46. Drainage around a greenhouse or shade house
  47. Mounds and drains for orchard trees
  48. Subsurface pipe drainage trial
  49. Drainage pond at the farm outfall
  50. Farm flood risk register and climate outlook

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Wet season flood mark map of the farm

After a heavy downpour the farm tells you exactly where it fails, but the evidence is gone within two days. Walking every field during or straight after a big rain and marking ponding, scoured paths, silt fans and the highest water line gives you the picture every later drainage decision depends on.

First tasks

  • Choose four fixed photo points and mark them with painted stakes
  • Walk every field after the next heavy rain and pace out the ponded areas
  • Paint the high water line on posts and buildings and photograph each
  • Draw the ponding, flow paths and silt fans on one sketch map
  • Rank the three wet spots that cost the most crop or working time

Catchment and outfall survey

Much of the water that floods a field falls on someone else's land first: a road, a hillside above, a neighbour's cleared lot. Knowing where water enters the farm, and where it can legally and physically leave, decides whether the answer is a cut-off drain at the top, bigger outlets at the bottom, or both.

First tasks

  • Walk the farm boundary and note every gully, road drain and spring coming in
  • Mark every ravine, river, public drain and low corner water could leave by
  • Watch the main outfall during a heavy rain and note whether it backs up
  • Write beside each point who owns or maintains it

Auger hole and percolation test by field

Two fields side by side can behave completely differently: one drains in an hour, the other holds water for three days because of a clay pan at 40 cm. A simple auger hole and percolation test in each field shows whether the problem is surface water, a hard layer or a high water table, and each needs a different fix.

First tasks

  • Borrow or buy a soil auger and a measuring stick marked in centimetres
  • Dig two holes in each field and note the depth of each soil layer
  • Fill each hole with water and record how far it drops in one hour
  • Label each field free draining, slow or waterlogged from below

Make it yours.

Install Farm Drainage and Flood Control, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.