Hardware Startup Prototyping

A costed bill of materials, staged prototype builds from EVT to PVT, suppliers and a factory you can trust, certification booked early and a first production run signed off against a written quality plan.

Free · Mac (Apple silicon) and Windows · v1.0.0 · Other platforms

Then open the Marketplace in the app, search for Hardware Startup Prototyping, and click Install. It goes into your own files, and works offline from then on.

What it installs.

1

Pillar

1

Area

50

Projects

204

Starter tasks

🚀 Founding & Startups

Hardware Startup Prototyping

Taking a physical product from prototype to first production run, with suppliers, certification, costs and long lead times.

  1. Product requirements document for the first device
  2. Looks-like and works-like prototype split
  3. First costed bill of materials
  4. Hardware risk register for the prototype programme
  5. Prototype budget and lead-time calendar
  6. Makerspace, lab bench and tool access
  7. Target unit cost and margin stack
  8. Prior art search and patent conversation
  9. Component selection with lifecycle and second sources
  10. Weekly hardware build review and engineering log
  11. Revision control for CAD, schematics and firmware
  12. BOM cost and part availability watch
  13. Supplier communication rhythm
  14. Lead time and build schedule tracker
  15. Prototype parts inventory and spares
  16. Bench test log and failure tracking
  17. Engineering change order process
  18. Prototype spend against the build budget
  19. Design for manufacture basics for injection moulding
  20. PCB design review and board house checks
  21. Firmware bring-up routine for new boards
  22. Lithium battery safety for prototypes
  23. Reading supplier quotes, incoterms and landed cost
  24. Printing, CNC or urethane casting for each prototype
  25. Pre-certified radio module versus custom design
  26. Contract manufacturer shortlist and RFQ
  27. Tooling strategy and mould quote comparison
  28. BOM cost-down review before tooling
  29. Retail packaging design and transit testing
  30. Design freeze decision before tooling
  31. Engineering validation test build
  32. Design validation test build
  33. EMC pre-compliance session at a test lab
  34. Certification plan and lab submission
  35. Production validation test and pilot run
  36. Golden sample and first article sign-off
  37. Factory visit before the production order
  38. Factory agreement, NNN terms and tool ownership
  39. Solo engineer founder prototyping part-time
  40. Software founder building hardware for the first time
  41. Working with an outside product design firm
  42. Crowdfunding fulfilment plan for hardware backers
  43. Dividing mechanical, electrical and firmware ownership
  44. Prototyping from a small island or remote market
  45. Design for test and end-of-line fixture
  46. Reliability and environmental testing programme
  47. Incoming and outgoing quality inspection plan
  48. Field returns and failure analysis loop
  49. Long-lead component buffer stock strategy
  50. Firmware update path and device provisioning

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Product requirements document for the first device

Hardware punishes vague requirements far harder than software, because a missed requirement found after tooling means cutting steel again. A short requirements document that fixes size, weight, battery life, operating temperature, ingress rating, target markets and target cost gives every engineer, supplier and test lab the same numbers to work to.

First tasks

  • List every number a customer would notice: size, weight, runtime, price
  • Tag each requirement as must, should or could
  • Write the list of countries you intend to sell into first
  • Hold a one-hour sign-off meeting and record the agreed version number

Looks-like and works-like prototype split

Trying to make the first prototype both look finished and work fully usually produces a device that does neither. Splitting early work into a looks-like model for customer and investor feedback and a works-like rig for proving the electronics and mechanics lets both move at full speed, then merge once each has answered its own questions.

First tasks

  • Write the five questions customers will ask about how the device looks and feels
  • Write the five technical questions the electronics must prove
  • Order printed parts for the looks-like model from a print bureau
  • Wire up the works-like rig on development boards and record its first power reading

First costed bill of materials

Founders routinely underestimate unit cost by half because the first BOM lists the chips and forgets the screws, gaskets, labels, cables, packaging and assembly labour. A costed BOM with every line, a quantity break and a source shows early whether the product can ever hit its price, while changing it is still cheap.

First tasks

  • Export the parts list from the schematic and the CAD assembly
  • Add every mechanical, packaging and labelling line by hand
  • Look up prices at three volumes on two distributor sites
  • Total the unit cost and set it beside the target cost

Make it yours.

Install Hardware Startup Prototyping, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.