Organisation Redesign

A clear case and design criteria, an honest map of today's structure, scored options, detailed reporting lines and role profiles, fair selection, and an announcement and transition handled with care.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Organisation Redesign, and click Install. It goes into your own files, and works offline from then on.

What it installs.

1

Pillar

1

Area

50

Projects

192

Starter tasks

♟️ Strategy & Leadership

Organisation Redesign

Redesigning structure, reporting lines and team boundaries to fit the strategy, and managing the transition with care.

  1. Case for redesign in one page
  2. Design criteria agreed with the sponsor
  3. As-is organisation map with headcount and cost
  4. Spans and layers baseline
  5. Activity analysis of where time really goes
  6. Redesign governance and confidentiality set-up
  7. Employment law and consultation ground rules
  8. Redesign risk register
  9. Capability gap map against the strategy
  10. Weekly design team working session
  11. Sponsor checkpoint and decision log
  12. Leak and access control review
  13. Headcount and vacancy freeze reconciliation
  14. Position data hygiene in the HR system
  15. Quarterly spans and layers health check
  16. Cutover issue log and daily stand-up
  17. Employee questions log and weekly FAQ
  18. Monthly manager pulse in the new units
  19. Annual structure review against the strategy
  20. Reading on structural archetypes
  21. Star model diagnosis of the current organisation
  22. Organisation modelling in a spreadsheet
  23. Writing role profiles with clear accountabilities
  24. Handoff design between new units
  25. Practising the role change conversation
  26. Job levelling basics with the reward team
  27. Three structural options scored against the criteria
  28. Deciding on dual reporting lines
  29. Centralise or devolve a support function
  30. Choosing the primary axis for team boundaries
  31. Removing a management layer
  32. Detailed design down to team level
  33. Fair selection into new roles
  34. Cost model of the new structure
  35. Big-bang or phased implementation decision
  36. Announcement day plan
  37. Manager briefing before the announcement
  38. Formal consultation meetings
  39. Go-live day for new reporting lines
  40. First team sessions in the new units
  41. Post-implementation review at 100 days
  42. Redesigning your own department as a manager
  43. Redesign under a cost reduction target
  44. Multi-country redesign coordination
  45. Leading a redesign that changes your own role
  46. Support for leavers and those who stay
  47. Restructuring after headcount has doubled
  48. Building an internal organisation design practice
  49. Product and platform team boundaries in technology
  50. Front-back customer structure design

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Case for redesign in one page

This is a team plan, best installed into a shared workspace so everyone with a role in it can see and own their tasks. Structure is the most expensive lever a leader can pull, and many redesigns start because a new executive wants a different chart rather than because the strategy needs one.

First tasks

  • List five recent failures that people blamed on the structure
  • Trace each failure to its cause with the people involved
  • Draft the one-page case with symptoms, causes and what structure fixes
  • Book an hour with the sponsor to agree go or no-go

Design criteria agreed with the sponsor

Without written criteria, every option looks good to whoever drew it and the final choice becomes a contest of personalities. Six to eight criteria drawn from the strategy, such as a single owner for each customer segment or no more than six layers to the front line, give the design team a fair test and the sponsor a defensible reason for the final choice.

First tasks

  • Pull the strategy's three year priorities into a single list
  • Write each capability the strategy needs as a testable design criterion
  • Weight the criteria with the sponsor and mark the two non-negotiables
  • File the signed-off criteria where the design team works

As-is organisation map with headcount and cost

Most leaders carry an out-of-date chart in their head, and the HR system's version usually has missing vacancies, contractors left off and people reporting to someone who left last year. Building one verified map of every position, with grade, cost, location and manager, is the base every option, cost model and selection decision will rest on.

First tasks

  • Request a position-level extract from HR including vacancies and contractors
  • Send each unit head their slice of the chart to correct
  • Add fully loaded cost, grade and location to each position
  • Lock the corrected file as the dated baseline

Make it yours.

Install Organisation Redesign, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms