Growth experiment charter and decision rights
This is a team plan, best installed into a shared workspace so everyone with a role in it can see and own their tasks. Growth teams that start testing without agreed rules end up arguing after every result about who can launch a test, what counts as a win and who makes the ship call.
First tasks
- List every flow the team expects to test in the next six months
- Draft approval rules for low-risk and high-risk tests
- Name who makes the ship, iterate or kill call on mixed results
- Circulate the charter draft to the product, engineering, design and data leads