Site Utilities and Connections

Power, water, sewer and telecoms brought to your site on time: demand estimates, asset searches, capacity enquiries, offers compared, wayleaves secured, costs tracked and the connection dates that hold up completion managed.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Site Utilities and Connections, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help you organise your own affairs. It is not legal advice, and following it does not make anyone your lawyer. Rules differ between countries and change often, so check decisions that matter, and anything you sign, with a qualified lawyer or the official authority in the country concerned.

What it installs.

1

Pillar

1

Area

50

Projects

199

Starter tasks

🏢 Real Estate Investing & Development

Site Utilities and Connections

Getting power, water, sewer and telecoms to a site: capacity checks, utility applications, wayleaves, connection costs and the timelines that hold schemes up.

  1. Services schedule for the scheme
  2. Statutory asset records search
  3. Utility survey with trial holes
  4. Utility demand estimate with the services engineer
  5. Appointing a utilities connection consultant
  6. Budget estimates from each network operator
  7. Connection cost allowance in the appraisal
  8. Utility lead times on the development programme
  9. Utility contacts and application register
  10. Weekly connections tracker review
  11. Monthly network operator chase round
  12. Utilities risk register kept live
  13. Connection cost tracker against offers
  14. Offer expiry and payment deadline watch
  15. Temporary builders' supplies on site
  16. Wayleave and easement tracker
  17. Utilities coordination slot in design team meetings
  18. Cross-scheme utilities lessons log
  19. Reading a connection offer letter
  20. Electrical load basics for developers
  21. Foul and surface water connection basics
  22. Water supply pressure and fire flow basics
  23. Wayleaves, easements and adoption explained
  24. Reinforcement charges and who pays
  25. Full fibre for new homes
  26. Independent connection provider versus network operator quote
  27. Substation siting and land transfer
  28. Gravity drainage or pumping station decision
  29. Gas or all-electric heating decision
  30. Self-lay water mains decision
  31. Fibre provider choice for the scheme
  32. Shared trench and service corridor layout
  33. EV charging capacity for the scheme
  34. Solar and battery to ease grid capacity
  35. Diversion of services crossing the site
  36. Disconnections before demolition
  37. Permanent connection and energisation day
  38. Road opening permits for off-site works
  39. Utility evidence for planning conditions
  40. Utilities pack for the lender's monitoring surveyor
  41. Meter registration and handover to buyers
  42. First scheme connections for a small developer
  43. Infill plot connections for a builder
  44. Landowner services statement before a sale
  45. Commercial conversion utility upgrades
  46. Caribbean utility applications for a single building
  47. Rural site with no mains services
  48. Private wastewater treatment plant
  49. Grid queue and phased load strategy
  50. Private wire and embedded generation export

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Services schedule for the scheme

Most connection delays start with a service nobody listed: the sprinkler supply, the landlord's lighting meter or the fibre duct to the bin store. A one-page schedule of every utility the scheme needs, who supplies it in your area and who on your team owns it turns a vague worry into a list of applications. Write it before the first enquiry so each provider is approached once, with the right information.

First tasks

  • List every service the finished scheme will need, including fire water and fibre
  • Find the network operator or authority for each service at the site address
  • Name an owner on your team for each service
  • Share the schedule with the architect and services engineer

Statutory asset records search

Network operators hold maps of the cables, mains, sewers and ducts they own, and a high voltage cable or trunk sewer under your plot can move the building or kill the scheme. Ordering the records from every provider before design starts shows what is there, what can be built over and what needs a diversion. The search is cheap compared with finding a live cable with an excavator.

First tasks

  • Request asset plans from each utility owner or through a combined search service
  • Overlay the returned plans on the site boundary drawing
  • Note the build-over and stand-off rules for each major asset
  • Re-run the asset search on each active site before works start @recurring(quarterly)

Utility survey with trial holes

Asset maps are often metres out and miss private and abandoned services altogether. A utility survey using radar and cable location, confirmed by a few hand-dug trial holes at the points that matter, gives the designers real positions and depths. It is what turns a provisional sum for diversions into a priced item.

First tasks

  • Ask two survey firms to quote for a radar and electromagnetic utility survey
  • Mark the connection points and clash locations that need trial holes
  • Check the survey drawing against the combined asset records
  • Send any unidentified services to the providers for confirmation

Make it yours.

Install Site Utilities and Connections, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.