Operations Improvement Engagements

Deliver operations improvement for a client: a measured baseline, process walks and value stream maps, bottleneck and loss analysis, pilots run on the floor with supervisors, and a handover client owners can run.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Operations Improvement Engagements, and click Install. It goes into your own files, and works offline from then on.

What it installs.

1

Pillar

1

Area

50

Projects

200

Starter tasks

📋 Management Consulting

Operations Improvement Engagements

Delivering operations improvement: process walks, value stream mapping, bottleneck analysis, pilots on the floor and handover to client owners.

  1. Operations scope and KPI definitions agreed
  2. Site safety induction and floor access
  3. Operational data pull for the site
  4. Baseline throughput, lead time and OEE
  5. First process walk with the site manager
  6. Site stakeholder map from director to shift lead
  7. Current-state value stream map
  8. Process mapping kit for the team
  9. Demand profile and shift pattern analysis
  10. Loss hypotheses across the eight wastes
  11. Twice-weekly floor time routine
  12. Weekly KPI pack for site leadership
  13. Tier meeting observation and coaching
  14. Pilot results log
  15. Floor action log with supervisors
  16. Monthly sustainment audit of implemented changes
  17. Frontline idea and feedback loop
  18. Monthly data refresh and baseline drift check
  19. Weekly safety and quality round on pilot areas
  20. Time studies and work sampling practice
  21. Bottleneck analysis and the theory of constraints
  22. Queueing and Little's law for service operations
  23. OEE loss tree for a constraint machine
  24. Changeover reduction with SMED
  25. Standard work and job breakdown sheets
  26. Root cause sessions with operators
  27. Control charts for process stability
  28. Spreadsheet capacity model for the line
  29. Opportunity prioritisation with the client
  30. Choosing the pilot line or area
  31. Floor pilot design and measurement plan
  32. Pilot area layout and 5S reset
  33. Planned maintenance versus breakdown review
  34. Work in progress limits and a kanban loop
  35. Capital versus operating fix comparison
  36. Translating throughput gains into value
  37. Kaizen week on the constraint
  38. Pilot launch day on the floor
  39. Mid-engagement results review with plant leadership
  40. Handover to client process owners
  41. Thirty-day post-handover check
  42. Night and weekend shift visits
  43. First operations engagement for a strategy generalist
  44. Operations work with a unionised workforce
  45. Hospital patient flow engagements
  46. Back-office and shared service process improvement
  47. Warehouse and distribution centre engagements
  48. Multi-site rollout from a lighthouse site
  49. Operations maturity diagnostic across a network
  50. Building the client's internal lean coaches

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Operations scope and KPI definitions agreed

This is a team plan, best installed into a shared workspace so everyone with a role in it can see and own their tasks. Operations engagements go wrong early when the client says throughput and means good units shipped, while the team measures units started.

First tasks

  • List the value streams, sites and shifts the client believes are in scope
  • Draft a formula, source and owner for each candidate KPI
  • Test each formula against one week of real site data
  • Walk the operations director through the sheet and record sign-off

Site safety induction and floor access

No consultant should be on a production floor, a warehouse aisle or a hospital ward without the site induction, the right protective equipment and a clear idea of where they may and may not walk. Sorting this before the first walk also earns early credibility with supervisors, who notice who follows the rules.

First tasks

  • Ask the site health and safety lead for the induction schedule and rules
  • Book every team member onto the induction before their first walk
  • Order the protective equipment each zone requires
  • Mark restricted and escorted areas on a copy of the site map

Operational data pull for the site

Ops analysis lives on production logs, downtime codes, scrap records, shift rosters and order histories, and most sites hold them in three different systems plus a supervisor's notebook. Asking for twelve months of these specific extracts in week one, and walking the people who keep them through the request, saves the baseline from being built on a fortnight of whatever arrived first.

First tasks

  • List the production, downtime, quality, labour and maintenance extracts needed
  • Find out which system or paper record holds each one
  • Send the request with grain and date range spelled out
  • Sit with the downtime data owner to decode the reason codes

Make it yours.

Install Operations Improvement Engagements, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.