Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.
Commissioning phases and vocabulary primer
Mechanical completion, pre-commissioning, commissioning, ready for start-up and performance test mean slightly different things on every project, and arguments about who owns a system usually start with a definition nobody wrote down. Learning the standard phase model and comparing it with your project's own definitions gives you the language for every handover, certificate and dispute that follows.
First tasks
- Find the clause in your contract that defines mechanical completion
- Sketch the phase sequence with the certificate that closes each stage
- Write a glossary of fifteen commissioning terms in plain language
- Ask the commissioning lead where the project departs from the standard model
Commissioning execution plan for the project
Without a written plan, commissioning starts when construction runs out of work and becomes a scramble for people, utilities and paperwork. An execution plan agreed six months or more before mechanical completion fixes the philosophy, the organisation, the systems, the sequence, the documents and the certificates, so everyone works to the same picture.
First tasks
- Collect two execution plans from past projects as reference
- Draft the table of contents and agree it with the commissioning manager
- Write the systemisation and sequence sections first
- Circulate the draft to construction, operations and process safety for comment
- Issue revision 0 once every comment has a response
System and subsystem boundaries on marked-up P&IDs
Systemisation is the backbone of commissioning: every tag, check sheet, punch item and certificate hangs off a system number. Drawing clear subsystem boundaries on the P&IDs and single-line diagrams, with every boundary at a valve, blind or breaker, lets construction finish by system rather than by area and lets you hand over in a sensible order.
First tasks
- Agree the system and subsystem numbering format with the completions lead
- Mark up the utility P&IDs first, starting with power, air and water
- Check every boundary sits at a valve, blind or breaker
- Build the system register from the marked-up drawings
- Walk the boundaries with an operations representative