Energy Transition Engineering Projects

Lower-carbon engineering that survives scrutiny: a measured emissions baseline, screened and costed options, flare and methane cuts, solar, storage, carbon capture and hydrogen studies, and savings proved after the work is done.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Energy Transition Engineering Projects, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help you organise your own work. It does not replace your professional judgement, the rules of your regulator or professional body, your firm's policies, or advice from a qualified lawyer, accountant or other adviser. Where a law, code or standard applies, use the current official version for your country, and get qualified sign-off on regulated or safety-critical work.

What it installs.

1

Pillar

1

Area

50

Projects

200

Starter tasks

🔧 Engineering Practice

Energy Transition Engineering Projects

Engineering lower-carbon projects in the region: utility-scale solar, carbon capture, green hydrogen studies, flare reduction and energy efficiency in existing plants.

  1. Site emissions baseline by source
  2. Greenhouse gas accounting boundary and method note
  3. Screening criteria for low-carbon project ideas
  4. Regional energy policy and target register
  5. Marginal abatement cost curve for the site
  6. Grid interconnection data pack for renewable projects
  7. Solar resource and site data collection
  8. Transition opportunity long list with owners
  9. Levelised cost and cost per tonne methods
  10. Monthly emissions and energy intensity dashboard
  11. Flare and vent volume tracking routine
  12. Energy efficiency opportunity register upkeep
  13. Methane leak detection and repair survey cycle
  14. Solar plant performance ratio monitoring
  15. Steam trap and compressed air survey cycle
  16. Measurement and verification of delivered savings
  17. Quarterly transition portfolio review
  18. Technology and policy watch log
  19. PV plant design fundamentals
  20. Amine carbon capture process basics
  21. Electrolysers and the green hydrogen chain
  22. CO2 compression, dehydration and transport properties
  23. Pinch analysis for heat integration
  24. Grid integration studies for variable renewables
  25. Methane measurement methods and reporting levels
  26. Battery energy storage design and safety
  27. Flare gas recovery unit concept study
  28. Open cycle to combined cycle conversion study
  29. Behind-the-meter solar for an operating plant
  30. High-efficiency motor and variable speed drive business case
  31. Module and inverter selection for coastal tropical sites
  32. Fixed tilt or single-axis tracker choice in hurricane zones
  33. Capture route choice for process CO2 streams
  34. Blue versus green ammonia pathway comparison
  35. Fired heater and steam turbine electrification study
  36. Solar farm energisation readiness
  37. Hydrogen pilot plant HAZID and HAZOP preparation
  38. Lender technical due diligence site visit
  39. Green hydrogen feasibility gate presentation
  40. Annual emissions report and third party verification
  41. Moving from oil and gas into renewables engineering
  42. Owner's engineer role on a utility-scale solar build
  43. Renewable integration on a small island grid
  44. Energy audit for a commercial or industrial client
  45. Plant decarbonisation roadmap as lead engineer
  46. CO2 storage screening in depleted gas reservoirs
  47. Floating solar on reservoirs feasibility
  48. Hydrogen blending compatibility review for gas pipelines
  49. Monitoring plan for a carbon credit flare reduction project
  50. Grid-forming inverter study for a hybrid solar and storage plant

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Site emissions baseline by source

Every credible transition project starts from a number, and most plants cannot say how many tonnes of CO2 equivalent come from fired heaters, gas turbines, flares, vents, process CO2 and purchased power. Building a source by source baseline for one full year, with the method and data quality noted for each line, gives every later study a fixed reference and stops two teams claiming the same tonnes.

First tasks

  • List every fired unit, flare, vent and process CO2 stream on the plot plan
  • Request twelve months of fuel gas and flare meter data from the historian
  • Record the emission factor and reference used for each source
  • Total the baseline by source and send it to the area lead for sign-off

Greenhouse gas accounting boundary and method note

Emissions figures fall apart in review when nobody wrote down whether the boundary is operational or equity control, which gases are counted, which global warming potentials were used and how purchased power is treated. A short method note, aligned to the GHG Protocol or ISO 14064 family and agreed before any project claims a reduction, settles those questions once.

First tasks

  • Ask the environmental lead which reporting standard the company already follows
  • Draft the boundary, gases and warming potential section on two pages
  • Write the rule for counting exported power, steam and shared utilities
  • Circulate the note for approval and file the signed copy with the baseline

Screening criteria for low-carbon project ideas

Most sites have more ideas than engineering hours, and without agreed criteria the loudest proposal gets studied first. Setting a scoring sheet that weighs tonnes abated, cost per tonne, technology readiness, safety change, shutdown needs and interfaces with the existing plant lets the team rank twenty ideas in an afternoon and defend the ranking.

First tasks

  • Draft six to eight criteria with a one-line scoring rule for each
  • Book a one-hour session with operations, finance and the technical authority
  • Score five existing ideas on the sheet and compare against gut ranking
  • Issue the agreed sheet as the entry gate for new ideas

Make it yours.

Install Energy Transition Engineering Projects, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.