Environmental Engineering Practice

Environmental engineering as it is really practised: permit registers, discharge limits and monitoring rounds, treatment works process control, EIA chapters, contaminated land investigation and remediation closure.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Environmental Engineering Practice, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help you organise your own work. It does not replace your professional judgement, the rules of your regulator or professional body, your firm's policies, or advice from a qualified lawyer, accountant or other adviser. Where a law, code or standard applies, use the current official version for your country, and get qualified sign-off on regulated or safety-critical work.

What it installs.

1

Pillar

1

Area

50

Projects

202

Starter tasks

🔧 Engineering Practice

Environmental Engineering Practice

Working as an environmental engineer: water and wastewater treatment, environmental impact assessments, permits, monitoring programmes and remediation projects.

  1. Environmental permit and consent register
  2. Discharge limits and water quality standards reference
  3. Choosing an accredited environmental laboratory
  4. Sampling field kit and chain of custody set-up
  5. Treatment works process walkdown and flow diagram
  6. Environmental aspects and impacts register
  7. Spill and exceedance notification procedure
  8. Monitoring programme design for a permitted site
  9. Monthly discharge compliance report
  10. Permit conditions and deadlines tracker
  11. Field instrument calibration log
  12. Treatment works daily process checks
  13. Laboratory data validation and quality control review
  14. Groundwater monitoring well sampling rounds
  15. Stormwater pollution prevention inspections
  16. Sludge and biosolids disposal records
  17. Hazardous waste tracking and consignment records
  18. Environmental monitoring database
  19. Activated sludge process control fundamentals
  20. Jar testing for coagulation and flocculation
  21. Reverse osmosis and desalination fundamentals
  22. Sewer and drainage hydraulic modelling
  23. Groundwater flow and contaminant transport basics
  24. Statistics for environmental monitoring data
  25. EIA screening and scoping report
  26. EIA baseline survey programme
  27. Impact significance assessment and mitigation
  28. Environmental management plan and commitments register
  29. Phase I environmental site assessment
  30. Phase II soil and groundwater investigation
  31. Conceptual site model and remediation criteria
  32. Remediation options appraisal
  33. Remediation verification and closure report
  34. Wastewater treatment technology options study
  35. Aeration energy and blower control review
  36. Industrial effluent characterisation and pretreatment
  37. Water reuse feasibility for an industrial site
  38. Odour complaint investigation at a treatment works
  39. Permit application or renewal submission
  40. Regulator site inspection readiness
  41. Wet season and hurricane readiness for treatment works
  42. Environmental compliance audit of a site
  43. EIA public consultation meeting
  44. Erosion and sediment control on a construction site
  45. Moving from consultancy to a regulator role
  46. Running monitoring work as a small environmental consultancy
  47. Managing environmental consultants as the site owner
  48. Biological nutrient removal upgrade
  49. Marine outfall dilution and mixing zone study
  50. PFAS and emerging contaminants screening

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Environmental permit and consent register

Every regulated site carries a stack of authorisations: discharge permits, water abstraction licences, air and waste approvals, an EIA certificate with conditions, sometimes a planning consent with environmental clauses. Pulling them into one register with issue dates, expiry dates, holders and the conditions that bite means nobody discovers a lapsed permit during an inspection.

First tasks

  • Ask the site manager and document controller for every environmental permit on file
  • List each permit with reference, holder, issue date and expiry date
  • Extract every condition that needs a report, sample or notification
  • Agree a named owner for each permit with the site manager
  • Check the register against the regulator's public permit list @recurring(yearly)

Discharge limits and water quality standards reference

Discharge limits come from several places at once: the permit itself, national effluent regulations, receiving water quality standards and sometimes a lender's environmental guidelines. A one-page reference showing each parameter, its limit, its averaging basis and its source stops the common mistake of comparing a single grab sample against a monthly average limit.

First tasks

  • Copy every numeric limit from the discharge permit into a table
  • Add the national effluent standards for the same parameters
  • Note whether each limit is a grab, daily or monthly average value
  • Mark the controlling limit per parameter and review it with your lead

Choosing an accredited environmental laboratory

Results only stand up with a regulator if the laboratory is accredited for the specific method and matrix, which is narrower than accredited in general. Comparing two or three laboratories on their ISO/IEC 17025 scope, detection limits, holding time logistics and turnaround gives you data you can defend and a backup when the main lab's courier misses a pick-up.

First tasks

  • Download the accreditation scope for three candidate laboratories
  • Check each scope against the methods your permit parameters need
  • Ask each lab for reporting limits, turnaround and courier options
  • Record the chosen main and backup laboratory with the reasons
  • Review laboratory turnaround and data errors with the account manager @recurring(yearly)

Make it yours.

Install Environmental Engineering Practice, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.