Factory Acceptance Testing

A working system for factory and site acceptance tests: test requirements pinned to the PO, ITPs and witness points agreed, criteria signed before the day, punch items closed and equipment released with its records.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Factory Acceptance Testing, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help you organise your own work. It does not replace your professional judgement, the rules of your regulator or professional body, your firm's policies, or advice from a qualified lawyer, accountant or other adviser. Where a law, code or standard applies, use the current official version for your country, and get qualified sign-off on regulated or safety-critical work.

What it installs.

1

Pillar

1

Area

50

Projects

200

Starter tasks

🔧 Engineering Practice

Factory Acceptance Testing

Planning and witnessing factory and site acceptance tests: test procedures, witness points, punch items, vendor documents and release for shipment.

  1. Map which packages need FAT, SAT or both
  2. Test requirements matrix from the purchase order
  3. Inspection and test plan review with each vendor
  4. Notification and witness point register
  5. Vendor FAT procedure review
  6. Acceptance criteria signed before the test
  7. Calibration evidence for vendor test instruments
  8. Pre-FAT readiness check with the vendor
  9. Personal safety on the vendor test floor
  10. Monday six-week test look-ahead
  11. Punch list from FAT to closure
  12. Manufacturing data record tracker
  13. Witness reports within two working days
  14. Monthly test readiness call with expediting
  15. Inspection release note process
  16. Non-conformance and concession handling
  17. Site test instrument register
  18. Lessons learned log from every FAT
  19. Witnessing hydrostatic and pneumatic pressure tests
  20. Reading a centrifugal pump performance test
  21. Compressor mechanical running test
  22. Switchgear and MCC factory tests
  23. Power transformer factory routine tests
  24. Control system FAT with simulated I O
  25. Safety instrumented system FAT against the cause and effect
  26. Valve shop pressure tests
  27. Vibration and noise readings during shop tests
  28. Risk-based choice of witness level per package
  29. Selecting a third-party inspection agency
  30. Remote witnessed FAT protocol
  31. Deciding on an integrated FAT for control systems
  32. Standard FAT procedure template for your organisation
  33. Vendor dry-run rule to cut repeat failures
  34. Pricing FAT and retest costs into the purchase order
  35. First overseas FAT witness trip
  36. FAT kick-off and close-out meetings
  37. Site acceptance test of a delivered package
  38. Release for shipment, preservation and packing check
  39. Full-load string test of a compressor train
  40. Retest after a failed FAT
  41. First FAT as a graduate observer
  42. Preparing the shop as the vendor's test engineer
  43. Client inspection lead covering many packages
  44. Running FAT alone on a small project
  45. Third-party inspector working to a client ITP
  46. FAT handover dossier for the commissioning team
  47. Performance guarantee shortfalls at FAT
  48. Cybersecurity checks in control system FAT
  49. FAT performance metrics across the portfolio
  50. Owner's general specification for FAT and SAT

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Map which packages need FAT, SAT or both

Every purchase order on a project carries some test obligation, but on a typical plant job only a fraction of the equipment packages justify sending someone to the vendor's shop. One table listing each package, the tests its specification demands and whether they happen at the factory, on site or both lets you plan witness travel, budget and schedule before vendors start booking test dates.

First tasks

  • Export the current procurement register with tag numbers and PO references
  • Mark each package FAT, SAT, both or review only with a one-line reason
  • Note the expected test month beside each package from quoted delivery dates
  • Walk the table through with the package engineers and record their changes

Test requirements matrix from the purchase order

Test obligations are scattered across the purchase order, the equipment datasheet, the project specifications and the standards those documents reference, and vendors quote against whatever they happened to find. Pulling them into one matrix per package, clause by clause, is how you discover before the test that the specification asked for a mechanical run test or a noise test that the vendor never priced.

First tasks

  • Open the PO, datasheet and specifications for the most critical package
  • List every test clause with its document number and section
  • Ask the agent to compare the matrix with the vendor's quoted test list and flag gaps
  • Send the gaps to the vendor as technical queries through the buyer

Inspection and test plan review with each vendor

The inspection and test plan is the working contract for what gets checked, by whom and when, and its hold, witness, monitor and review codes decide whether production can carry on without you. Reviewing each vendor's ITP against your requirements matrix soon after award stops the classic failure where a hold point appears for the first time in a notification email.

First tasks

  • Chase every ITP not yet received for packages on the FAT list
  • Check each ITP line against the test requirements matrix
  • Mark client hold and witness points on the critical tests
  • Return the commented ITPs with a resubmission date

Make it yours.

Install Factory Acceptance Testing, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.