HAZOP Studies

Everything a HAZOP needs from one engineer: a clear scope, sound nodes and design intent, a well run session, worksheets that stand up to audit, and actions closed out with named owners and evidence.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for HAZOP Studies, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help your team organise its work. It does not replace professional judgement, the rules of your regulator or professional body, your organisation's policies, or advice from a qualified lawyer, accountant or other adviser. Where a law, code or standard applies, use the current official version for your country, and get qualified sign-off on regulated or safety-critical work.

What it installs.

1

Pillar

1

Area

50

Projects

200

Starter tasks

🔧 Engineering Practice

HAZOP Studies

Preparing, leading or taking part in a HAZOP: nodes, guidewords, deviations, causes and safeguards, recording actions and closing them out with named owners.

  1. HAZOP method grounding from IEC 61882
  2. Study terms of reference and scope boundary
  3. Node breakdown on a marked-up P&ID set
  4. Design intent statements for every node
  5. Guideword and parameter set for the study
  6. HAZOP pre-read pack and readiness check
  7. Risk matrix and ranking rules for the study
  8. Worksheet template and recording tool set-up
  9. HAZOP team composition and attendance plan
  10. HAZOP action register with named owners
  11. Weekly HAZOP action close-out meeting
  12. Action closure evidence standard
  13. End-of-day worksheet review during a live study
  14. Overdue HAZOP action escalation routine
  15. Site HAZOP study register
  16. HAZOP revalidation cycle
  17. Drawing revisions tracked against the HAZOP record
  18. Personal HAZOP participation and competence log
  19. Field verification of HAZOP safeguards
  20. Writing deviations, causes and consequences
  21. Credible safeguards versus wishful ones
  22. Writing HAZOP recommendations that get closed
  23. Scribing a HAZOP well
  24. Chairing your first HAZOP sessions
  25. P&ID reading fluency for HAZOP
  26. Procedural HAZOP of start-up and shutdown
  27. Overpressure and relief scenarios in HAZOP
  28. HAZOP reading list and incident case studies
  29. Choosing HAZOP recording software
  30. HAZOP or a lighter hazard method
  31. Remote and hybrid HAZOP session set-up
  32. Library of recurring HAZOP findings
  33. Quality audit of a completed HAZOP
  34. Scenario hand-off from HAZOP to further assessment
  35. HAZOP kick-off meeting
  36. HAZOP report issued for approval
  37. HAZOP close-out report and action sign-off
  38. Vendor package HAZOP at the supplier
  39. Brownfield tie-in HAZOP before a turnaround
  40. Design-stage HAZOP on a FEED package
  41. Your first HAZOP as a graduate team member
  42. Operations representative in a HAZOP
  43. Client representative on a contractor-led HAZOP
  44. Contractor engineer answering HAZOP actions
  45. Lean-team HAZOP on a small site
  46. Batch and non-continuous process HAZOP
  47. Control system HAZOP for a new DCS
  48. Human factors review inside the HAZOP
  49. Becoming a recognised HAZOP leader
  50. Mentoring new scribes and HAZOP leaders

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

HAZOP method grounding from IEC 61882

People sit in HAZOPs for years without reading how the method is meant to work, and it shows in vague deviations and safeguards that are really just hopes. Working through the application guide in IEC 61882 and the hazard evaluation guidance from CCPS gives you the shared vocabulary of nodes, design intent, guidewords, parameters, deviations, causes, consequences and safeguards that every later project relies on.

First tasks

  • Find the current editions of IEC 61882 and your company HAZOP procedure
  • Write a one-page summary of the study stages from definition to follow-up
  • Build a glossary of twelve HAZOP terms with a plant example for each
  • Book thirty minutes with the process safety lead to ask your three questions

Study terms of reference and scope boundary

Arguments in week two of a HAZOP about whether the flare header or the vendor skid is in scope cost days and goodwill. A signed terms of reference fixes the scope boundary, the drawing revisions, the design stage, the risk matrix, the recording method and who approves the report before anyone opens a P&ID in the room.

First tasks

  • Ask the project lead for the latest PFD and the list of P&IDs in scope
  • Mark the scope boundary and every tie-in on one overall drawing
  • Draft the terms of reference covering scope, exclusions, team and approval
  • Get the sponsor and the HAZOP leader to sign the final terms of reference

Node breakdown on a marked-up P&ID set

Nodes that are too big hide deviations, and nodes that are too small turn a two-week study into six. Dividing the P&IDs into nodes by design intent, usually at changes of pressure, phase, composition or function, and colouring them on a controlled set gives the team a map they can follow and the scribe a reference for every row.

First tasks

  • Print or open a controlled copy of every in-scope P&ID at the frozen revision
  • Draw node boundaries at changes of pressure, phase or function
  • Write a node list with drawings, boundaries and equipment for each node
  • Walk the node list through with the process engineer and fix any gaps

Make it yours.

Install HAZOP Studies, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.