Industrial and Manufacturing Engineering

Plant floor engineering done properly: routings, takt and capacity, time studies, OEE and SPC, standard cost, layouts, kaizen and the specialist work of scheduling and greenfield plant design.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Industrial and Manufacturing Engineering, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help you organise your own work. It does not replace your professional judgement, the rules of your regulator or professional body, your firm's policies, or advice from a qualified lawyer, accountant or other adviser. Where a law, code or standard applies, use the current official version for your country, and get qualified sign-off on regulated or safety-critical work.

What it installs.

1

Pillar

1

Area

50

Projects

201

Starter tasks

🔧 Engineering Practice

Industrial and Manufacturing Engineering

Working as an industrial or manufacturing engineer: line layout, time studies, capacity, quality tools, production cost and continuous improvement on the plant floor.

  1. Gemba walk and process map of one product family
  2. Routing and bill of operations accuracy check
  3. Standard work for the bottleneck station
  4. Takt time and customer demand baseline
  5. OEE measurement on the constraint machine
  6. Plant capacity model for key resources
  7. Standard cost build-up for a top product
  8. Scaled floor layout and flow distance baseline
  9. Ergonomics and safety baseline walk of the line
  10. Daily tiered production meeting and board
  11. Weekly OEE loss review on the constraint
  12. SPC charts on critical characteristics
  13. Monthly scrap and rework cost report
  14. 5S audit routine for the production area
  15. Shop floor improvement idea system
  16. Monthly capacity against demand check
  17. Layered process audits of standard work
  18. Labour efficiency and utilisation reporting
  19. Customer complaint and quality escape log
  20. Stopwatch and video time study
  21. Value stream map, current and future state
  22. Gauge R&R and measurement system analysis
  23. Process capability study for a key feature
  24. Designed experiment on a process setting
  25. Line balancing with yamazumi charts
  26. Discrete event simulation of a production line
  27. Design for manufacture and assembly review
  28. SMED changeover reduction on one machine
  29. Functional layout to product cell conversion
  30. Kanban supermarket for purchased components
  31. Error proofing for a repeat defect
  32. Ergonomic redesign of a high-risk workstation
  33. Make versus buy analysis for a component
  34. Cobot or automation business case for a manual station
  35. Constraint debottleneck study
  36. Five-day kaizen event on one cell
  37. New product production readiness and launch
  38. Quality management certification audit preparation
  39. New equipment installation over a planned shutdown
  40. Annual labour standards and cost rates update
  41. First 90 days as a plant manufacturing engineer
  42. Sole engineer in a small manufacturing business
  43. Moving up to continuous improvement manager
  44. Lean six sigma green belt certification project
  45. Industrial engineering in a food and beverage plant
  46. Setting time standards with a unionised workforce
  47. Finite capacity scheduling for a job shop
  48. Systematic layout planning for a greenfield plant
  49. Shop floor data and MES requirements
  50. Plant-wide productivity improvement roadmap

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Gemba walk and process map of one product family

Most plant problems look different on the floor from how they look in the ERP system, so the first job in any new area is to follow one product family from goods-in to dispatch with a notebook. Walking the route, timing a few steps and sketching every queue and hand-off gives you a picture that every later study, layout and cost calculation can be checked against.

First tasks

  • Agree with the production manager which product family to follow
  • Walk the route from goods-in to dispatch with a notebook and stopwatch
  • Sketch every operation, queue and transport on one sheet
  • Note the three biggest surprises and talk them through with the supervisor

Routing and bill of operations accuracy check

Routings in the planning system drive capacity, scheduling and costing, and on many plants they were loaded years ago and never revisited. Comparing the system routing for your top ten parts with what actually happens on the floor exposes missing operations, wrong work centres and standard times that bear no relation to reality.

First tasks

  • Export routings for the ten highest-volume parts
  • Check each operation sequence and work centre on the floor
  • Record set-up and run time differences with your evidence
  • Submit the agreed corrections through master data control

Standard work for the bottleneck station

Variation at the constraint costs the whole plant output, and it usually comes from three operators doing the job three ways. Writing standard work for that one station, with the work sequence, takt, standard work-in-process and key quality points, gives a stable base to train against and to improve from.

First tasks

  • Watch the bottleneck job on each shift and note method differences
  • Agree the best sequence with the most experienced operators
  • Draft the standard work sheet with element times and takt
  • Train and sign off each operator on the new sheet

Make it yours.

Install Industrial and Manufacturing Engineering, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.