LNG Plant Operations and Engineering

The engineering of an LNG plant from feed gas to ship: liquefaction trains understood, cryogenic hazards respected, compressors and cold boxes watched, tanks and loading managed, and the Point Fortin context known.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for LNG Plant Operations and Engineering, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information, not a safety manual or a substitute for proper training. Follow the law where you live and work, the manufacturer's and label instructions for machinery, chemicals, animal medicines and equipment, and any site safety rules. Use trained, licensed or certified people for regulated work such as electrical, gas, structural, pesticide or veterinary work, and stop if something seems unsafe.

What it installs.

1

Pillar

1

Area

50

Projects

200

Starter tasks

🔧 Engineering Practice

LNG Plant Operations and Engineering

Engineering for LNG production: liquefaction trains, feed gas supply, rotating equipment, storage and ship loading, reliability, and the Atlantic LNG plant at Point Fortin.

  1. LNG value chain and plant layout primer
  2. Liquefaction process technology comparison
  3. Liquefaction train P&ID walk-down
  4. Feed gas specification and contaminant limits sheet
  5. Cryogenic hazards and personal safety briefing
  6. Personal technical file for an LNG train
  7. Train key performance baseline
  8. Point Fortin LNG site orientation
  9. Control room shadowing on a liquefaction train
  10. Daily liquefaction train health check
  11. Cold box and cryogenic exchanger performance trending
  12. Refrigerant compressor condition monitoring round
  13. Monthly feed gas quality and volume reconciliation
  14. Mercury removal and dehydration bed tracking
  15. Acid gas removal unit health review
  16. Flare and boil-off gas monthly reporting
  17. LNG storage tank stratification watch
  18. Train operating envelope and alarm limits review
  19. Monthly LNG production loss accounting
  20. Refrigerant inventory and purity management
  21. Hand mass and energy balance across a train
  22. Gas turbine driver fundamentals for LNG
  23. Cryogenic materials and piping behaviour
  24. Compressor surge and anti-surge control
  25. Brazed aluminium exchanger thermal stress limits
  26. LNG properties and heating value fundamentals
  27. Liquefaction train debottleneck screening
  28. Specific power and fuel gas reduction study
  29. Lean feed gas impact assessment
  30. Boil-off gas recovery during ship loading
  31. Ambient temperature and air cooler performance study
  32. Critical cryogenic spares strategy
  33. Liquefaction train trip reduction programme
  34. First LNG ship loading as duty engineer
  35. Liquefaction train restart and cool-down plan
  36. Cold box derime campaign
  37. Annual loading arm and jetty integrity check
  38. LNG spill and jetty fire emergency drill
  39. Post-outage train capacity test
  40. Moving from refining or petrochemicals into LNG
  41. Operations support engineer first rotation
  42. Rotating equipment engineer on an LNG plant
  43. Engineering input to the annual delivery programme
  44. Contract engineer onboarding at an LNG site
  45. Cryogenic exchanger leak detection and management
  46. LNG tank rollover risk assessment
  47. Custody transfer measurement and cargo quantity checks
  48. Dynamic simulation and operator training simulator use
  49. Ageing LNG train life extension review
  50. Preserving an idled liquefaction train

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

LNG value chain and plant layout primer

Anyone joining an LNG plant from another industry meets a new vocabulary on day one: trains, cold boxes, boil-off, heel, cargo windows and annual delivery programmes. Mapping the chain from the upstream gas field to the regasification terminal, and then the main blocks of your own site, gives every later conversation a place to sit.

First tasks

  • Get a current site plot plan from document control
  • Sketch the chain from gas field to regasification terminal on one page
  • Write a glossary of twenty LNG terms including heel, boil-off and cargo window
  • Ask an operator to walk you round the main blocks of one train

Liquefaction process technology comparison

Liquefaction processes differ mainly in how they arrange the refrigeration: pure refrigerant cascades in plate-fin cold boxes, propane precooled mixed refrigerant with a spiral-wound main exchanger, single mixed refrigerant for smaller trains, and nitrogen expanders for small scale.

First tasks

  • Find two published papers comparing liquefaction process families
  • Draw your plant's refrigeration loops as a block diagram
  • Fill a comparison table for cascade, propane precooled MR, single MR and expander cycles
  • Review your strengths and weaknesses note with a senior process engineer

Liquefaction train P&ID walk-down

Drawings only become real once you have stood next to the equipment they show. Walking one train from the inlet slug catcher to the rundown line to storage, with marked-up P&IDs in hand, turns a stack of drawings into a mental map you will use in every upset, permit and design query for years.

First tasks

  • Ask the area supervisor to assign an operator for a walk-down
  • Print the inlet to rundown P&IDs and mark a walk route
  • Tick off each major equipment item as you find it in the field
  • Send the drawing discrepancies you found to document control

Make it yours.

Install LNG Plant Operations and Engineering, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.