Management of Change

A working management of change system: clear rules on what counts as a change, risk-tiered reviews, temporary change expiry, pre-start-up checks, updated drawings and the audits that prove it works.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Management of Change, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help your team organise its work. It does not replace professional judgement, the rules of your regulator or professional body, your organisation's policies, or advice from a qualified lawyer, accountant or other adviser. Where a law, code or standard applies, use the current official version for your country, and get qualified sign-off on regulated or safety-critical work.

What it installs.

1

Pillar

1

Area

50

Projects

200

Starter tasks

🔧 Engineering Practice

Management of Change

Controlling changes to plant, process and procedures: the change request, technical and safety review, approvals, updated drawings, training and post-change checks.

  1. Site MOC procedure gap check against good practice
  2. Site definition of a change with worked examples
  3. Replacement-in-kind equivalence checklist
  4. Change request form reviewers can act on
  5. MOC roles and approval authority matrix
  6. Risk screening tiers for proposed changes
  7. Baseline register of open changes
  8. Temporary change rules with hard expiry dates
  9. Emergency change route for out-of-hours work
  10. Document and PSI impact checklist for each change
  11. Weekly change review board meeting
  12. Monthly overdue temporary change sweep
  13. Monthly MOC backlog and ageing report
  14. Drawing and document closeout before MOC closure
  15. Pre-start-up safety review checklist routine
  16. Safety system bypass and override register
  17. Operating limit, setpoint and alarm change log
  18. Affected people briefings before start-up
  19. Post-change performance checks at 30 and 90 days
  20. Quarterly sample audit of closed changes
  21. Writing a change request that passes first review
  22. Case studies of change failures from major incidents
  23. Choosing the right hazard review for the size of change
  24. Marking up P&ID redlines for a change
  25. Reviewing a change as a technical approver
  26. Process safety information a change can touch
  27. Software and control system changes under MOC
  28. Choosing an electronic MOC workflow system
  29. Moving MOC records from paper to an electronic system
  30. Cutting MOC cycle time without cutting the review
  31. One front door for engineering, maintenance and procedure changes
  32. MOC performance indicators with clear definitions
  33. Legacy temporary change clean-up campaign
  34. Approver calibration on change classification
  35. Field walkdown for unrecorded changes
  36. Preparing for an MOC compliance audit
  37. Turnaround change package approved by scope freeze
  38. Start-up readiness after a major modification
  39. Presenting MOC records to a regulator or insurer
  40. Annual MOC procedure revision and reissue
  41. First 90 days as MOC coordinator
  42. Raising and approving changes on night shift
  43. Contractor and vendor field changes during a project
  44. Lean MOC for a small site or single-unit plant
  45. Organisational change MOC for restructures and staff cuts
  46. Bringing an acquired site onto your MOC system
  47. Creeping change review of cumulative small modifications
  48. Feedstock, catalyst and chemical supplier changes
  49. Human factors review of procedure and HMI changes
  50. Mothballing and recommissioning a unit under change control

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Site MOC procedure gap check against good practice

Most sites have an MOC procedure, but many were written years ago and drift from what regulators and good practice now expect, such as the US OSHA PSM change element, EU Seveso and UK COMAH duties, or the CCPS management of change guidelines.

First tasks

  • Download the controlled copy of the site MOC procedure and note its revision
  • Choose the regulation or guidance the comparison will use
  • Build a gap table of requirement, site clause and status
  • Review the top five gaps with the procedure owner

Site definition of a change with worked examples

Arguments about whether something needs an MOC waste days and, worse, let real changes through as routine maintenance. A one-page definition with twenty worked examples from your own plant, such as a new chemical injection point, a changed relief valve set pressure or a revised operating sequence, gives originators and supervisors the same answer every time.

First tasks

  • Pull ten recent work orders that were argued over as possible changes
  • Draft the plain-language definition of a change for this site
  • Classify twenty examples with a one-line reason for each
  • Circulate the page to the operations, maintenance and engineering leads

Replacement-in-kind equivalence checklist

Replacement in kind is the route most unreviewed changes slip through: a pump impeller trimmed differently, a gasket in another material, a transmitter with a new range or a valve from a different maker. A short checklist that tests material, rating, dimensions, function and performance against the original specification lets a planner decide in minutes and sends genuine differences into review.

First tasks

  • List five recent replacements where the new part differed from the old one
  • Write the equivalence tests with the source document for each
  • Trial the checklist on ten replacements from the last quarter
  • Agree with the maintenance planner where the checklist sits in the process

Make it yours.

Install Management of Change, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.