Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.
Marine rules and conventions reference set
Almost every decision in an engine room traces back to a short list of instruments: SOLAS for machinery and fire safety, MARPOL Annexes I, IV, V and VI for oil, sewage, garbage and air, STCW for watchkeeping and competence, the ISM Code for the safety management system, plus the rules of the classification society the vessel is entered with.
First tasks
- List the conventions and codes on the engine room bookshelf with their editions
- Find the class society and notations on the vessel's class certificate
- Read the engine department chapters of the safety management system
- Report missing or outdated publications to the superintendent
Certificate of competency and STCW document file
A lapsed medical, an expired advanced firefighting course or a missing flag endorsement can stop you signing on, and the gap is usually discovered at the airport. Keeping your certificate of competency, endorsements, seafarer medical, STCW courses and sea service testimonials in one dated file means you see every expiry six months ahead.
First tasks
- Gather every certificate and endorsement into one folder
- Write each issue and expiry date into a single table
- Book the renewal or refresher course for anything expiring within a year
- Ask each past vessel for a missing sea service testimonial
- Check the document table for expiries in the next six months @recurring(quarterly)
Tracing machinery systems on a new vessel
Joining a ship you have never sailed on, the fastest way to become useful is to walk every system from tank to consumer with the piping diagrams in hand. Tracing fuel, lube oil, cooling water, compressed air, bilge and fire main within the first two weeks means you can isolate, line up and fault-find without asking where a valve is during an alarm.
First tasks
- Collect the piping diagrams for fuel, lube oil and cooling water systems
- Walk the fuel oil system from bunker tank to main engine with the drawing
- Mark valve numbers that differ from the drawing in red
- Sketch the sea water cooling system from memory and compare
- Hand the marked-up drawings to the chief engineer