Plant Turnarounds and Shutdowns

A turnaround run as a project with gates: scope challenged and frozen on time, contractors mobilised safely, a critical path you trust, costs forecast weekly and a start-up that goes right first time.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Then open the Marketplace in the app, search for Plant Turnarounds and Shutdowns, and click Install. It goes into your own files, and works offline from then on.

Before you start: this plan is general information to help your team organise its work. It does not replace professional judgement, the rules of your regulator or professional body, your organisation's policies, or advice from a qualified lawyer, accountant or other adviser. Where a law, code or standard applies, use the current official version for your country, and get qualified sign-off on regulated or safety-critical work.

What it installs.

1

Pillar

1

Area

50

Projects

209

Starter tasks

🔧 Engineering Practice

Plant Turnarounds and Shutdowns

Planning and running a plant turnaround: scope freeze, contractor mobilisation, the critical path, safety on a crowded site, cost control and the start-up after.

  1. Turnaround milestone timeline from T-24 months
  2. Turnaround charter with duration, cost and safety targets
  3. Lessons from the last turnaround close-out
  4. Turnaround organisation and role descriptions
  5. Work list intake and scope challenge rules
  6. Run length and turnaround interval basis
  7. Turnaround risk register from the first planning meeting
  8. Turnaround budget structure and cost codes
  9. Safety plan for a crowded turnaround site
  10. Weekly turnaround preparation meeting
  11. Readiness scoring at each milestone gate
  12. Long-lead materials expediting tracker
  13. Late scope addition control after freeze
  14. Work pack register and quality checks
  15. Cost tracking and forecast to complete
  16. Deferred work list between turnarounds
  17. Multi-year turnaround programme across units
  18. Contractor safety performance reviews in preparation
  19. Emergent work triage process for execution
  20. Critical path scheduling for turnaround networks
  21. Writing a turnaround work pack
  22. Unit blind list and positive isolation register
  23. Shutdown, decontamination and gas freeing sequence
  24. Heavy lift and crane plan on a congested plot
  25. Progress measurement and earned value for turnarounds
  26. Inspection scope and finding decisions in the plan
  27. Contracting strategy for the turnaround
  28. Main contractor bid evaluation and award
  29. Moving work into pre-shutdown and post start-up windows
  30. Critical path duration reduction study
  31. Site logistics, laydown and temporary facilities plan
  32. Shift pattern and fatigue rules for execution
  33. Scope freeze milestone
  34. Contractor mobilisation and site induction
  35. Shutdown day and handover to maintenance
  36. Pre-start-up safety review and handback to operations
  37. Start-up and first 72 hours on line
  38. Close-out report and lessons workshop
  39. First turnaround as a seconded engineer
  40. Night shift area coordinator handover
  41. First 90 days as a turnaround manager
  42. Lean outage plan for a small plant
  43. Forced outage rapid planning playbook
  44. Process engineer's shutdown and start-up performance baseline
  45. Catalyst change-out planning
  46. Schedule risk analysis with duration ranges
  47. Site-wide outage with shared utilities
  48. Wrench time and productivity study during execution
  49. Turnaround maturity assessment and benchmarking
  50. Reusable job pack and estimate library

Where it starts.

Each project arrives with its purpose, milestones and first tasks written out. Here is how the first three read.

Turnaround milestone timeline from T-24 months

Every well-run turnaround works backwards from the shutdown date along a published milestone timeline, often counted as T-24 months to T+3 months. Without one, scope arrives late, long-lead items miss the window and the plan is still being written when contractors arrive. Drawing the timeline first gives every later project a date to aim at and lets the steering group see slippage while it can still be fixed.

First tasks

  • Confirm the target shutdown date and planned duration with operations
  • List the milestones your site turnaround procedure requires
  • Count back from the shutdown date to set a date for each milestone
  • Assign an owner and a done definition to every milestone
  • Issue the timeline to the steering group for endorsement

Turnaround charter with duration, cost and safety targets

Signed by the plant manager, a charter settles the arguments that otherwise surface in week two of execution: what the turnaround is for, how long it may take, what it may cost and what safety performance is expected. It also names who can approve scope, money and schedule changes, so the team does not have to escalate every decision.

First tasks

  • Collect the business drivers from operations, integrity and projects
  • Draft numeric targets for duration, cost, safety and start-up
  • Write the decision rights table with approval limits by role
  • Ask the agent to tighten the charter draft to two pages
  • Book the signing meeting with the plant manager and sponsor

Lessons from the last turnaround close-out

The same mistakes repeat from one turnaround to the next because the close-out report from four years ago sits unread in a shared drive. Pulling its lessons into the current plan, with an owner for each, is the cheapest improvement available. It also tells you which estimates, contractors and work packs were trusted and which were not.

First tasks

  • Find the last close-out report and incident log for this unit
  • List every lesson and mark whether it was acted on
  • Pick the ten lessons most likely to repeat this time
  • Turn each chosen lesson into an owned action on the timeline

Make it yours.

Install Plant Turnarounds and Shutdowns, then tell Aurum the date you're aiming for. It checks whether the plan fits the weeks you actually have.

Free · Mac (Apple silicon) and Windows · v1.0.5 · Other platforms

Blueprints are general information to help you organise your own work. They are not medical, financial, legal or other professional advice. See the Terms.